Blog

Events

 
 
 
 
 
 

Pre-Purchase New 13.2kV Metalclad Switchgear Equipment Substation 602A

Deadline: Oct 20, 2017

The Philadelphia Industrial Development Corporation (PIDC) is issuing this Request for Proposal regarding a pre-purchase package containing a 13.2kV metal clad switchgear lineup, 125 VDC stationary battery control power system and a system control network.
The equipment included in the pre-purchase specifications will accept two (2) new feeders from the West End Substation to deliver power safely to the tenants of the Philadelphia Navy Yard. This contract will not include the means to install the equipment, but does include onsite support such as acceptance testing and training once the switchgear, battery control power system and system control network are installed
within substation 602A.

Proposal Requirements and Submission Information
• Two copies, letter sized hardcopy document in soft report cover
• Do not include physical tabs and dividers, empty pages, marketing material
• One electronic copy (PDF) emailed, before deadline
• Memory stick or CD by registered mail or personal delivery, due by bid deadline.
• Marketing collateral or manufacturer cut-sheets may be provided but separate
from proposal and ONLY as PDF documents.


• Send to: Rudy Terry
Director, Smart Grid Operations
PIDC
4747 South Broad Street
Building 101, Suite 120
Philadelphia, PA 19112
rterry@PIDCphila.com, P 215.218.2846


o All inquiries concerning this Request for Proposal should be directed to
Rudy Terry at the email address provided above.
o All inquirers concerning the GE/Alstom portion of this Request for
Proposal should be directed to Paul Benoit via email:
paul.benoit@alstom.com.

Project Manager: Rudy Terry
Info Request Emails go to: rterry@pidcphila.com